LR Series S Curved Flexible Mud In LED Channel - 18mm Light

Model: QSG-5912LR Review stars 0.0 (0 Reviews) Various options in stock
Starting at: $27.98
Qty Discounts Off Price
1-19
$27.98
20-49
$27.42
50-99
$26.86
100+
$26.30
* Discounts may vary based on options below
Select Specifications:
Select Diffuser:
Select Channel Color:
Qty: -+
❓ Ask a question about this item — an engineer replies within 12 hours
Free shipping over $299Ships via DHL / UPSWarranty covered

Accept the project customization, please contact us for commercial offers and technical support.

  • Product Information
  • Reviews
  • Downloads
  • Images
  • LED Strip Lights Guide

Product Information

Flexible LED channel is an important element in creative architectural lighting design. This 5912LR flexible aluminium led profile allows you to create as many S-shaped wave light lines as you like, note that the minimum bending diameter is 600mm (23.6"). And it is completely embedded in the wall or ceiling, presenting an 18mm (0.7") wide light.

You can attach light strips (sold separately) to the sides or bottom of the flexible extrusion profile. For side mounting, it use led strips up to 7mm wide; for bottom mounting, use S type led strips. A translucent silicone light cover is included to even out the LED light; the silicone cover can be up to 50 meters long. You can choose a long diffuser cover piece or several diffuser covers to meet your installation needs, e.g. you purchase 10pcs 1m 5912LR channels, we will send you 10pcs 1m diffuser covers or 1pcs 10m diffuser cover. 

If you are an architect or you are designing your house, consider using this 5912LR S curved flexible strip light channel to enhance your architectural features. We also offer a straight version 5912 and up-down bending version to meet your different lighting needs. 

 

Recommended to use multiple 1m mud-in 5912LR channels spliced together to achieve long distance installations. When purchasing 2m 5912LR flexible led strip light channels, the minimum purchase is 10 pieces, otherwise an additional extra length charge will apply according to DHL/UPS shipping regulations.

 

Product Specification

Product Type:  LR Series S Curved Flexible Mud In LED Channel
Material:  6063-T5 Aluminum Alloy
Channel Size: 
W59mm(2.32")*H12mm(0.47")
Inner Width:  16.3mm(0.64")
Color:  Anodic silver oxidation
LED Diffuser:  Silicone semi-clear diffuser cover
Length:  1m(3.28ft), 2m(6.56ft)
Accessory:  1*flexible aluminum extrusion, 1*silicone diffuser cover, 2*end cap
Installation:  Recessed
Apply to: 

5mm/6mm strip light for side mounting

S type led strip for bottom mounting

 

LR Series S Curved Flexible Mud In LED Channel - 18mm Light

LR Series S Curved Flexible Mud In LED Channel - 18mm Light

Reviews

Customer Experience

Your feedback is important to us! Share your thoughts and photos with other customers.

Downloads

Files for QSG-5912LR
Need CAD drawings, IES files or a signed test report? Contact our engineers and quote the model number.

Images

These images were taken with Canon EOS 5D Mark IV and the studio light source is provided by Ra 98's full spectrum LED strip to realistically reproduce the colors of the item itself. All copyrights are created by the superlightingled team, please feel free to browse and download if you are a registered user!

 LR Series S Curved Flexible Mud In LED Channel - 18mm Light LR Series S Curved Flexible Mud In LED Channel - 18mm Light LR Series S Curved Flexible Mud In LED Channel - 18mm Light

LED Strip Lights Guide

Here you can learn anything about LED strip lights — pick the topic you are interested in to go deeper. We cover LED strip lights, power supplies, controllers, accessories, and how to connect LED strip lights.  You can also watch our demo videos.


Led strip lights

►Everything you need to know before you buying led strip lights

Top 6 Considerations Before Buying LED Strip Lights

1. Where do I want to place the LED strip lights? Indoor or outdoor?

• What are waterproof led strip lights?

• How to cut and connect waterproof led strip lights?

2. How much LED brightness do I need?

3. The working voltage is available?

• 5V VS 12V VS 24V led strips

• AC VS DC 

4. How long is the LED strip light suitable for my project?

5. Do I need an LED light controller to adjust the LED color and brightness?

6. How to power the LED strip lights?

What are led strip lights?

1. How do led strip lights work?

2. How long can you run an LED strip?

3. How long do LED strip lights last?

Is it worth getting led strip lights?  

1. Do LED strip lights use a lot of electricity?

2. Why are LED lights energy efficient?

3. Are LED Strip Lights sustainable?

4. What are the pron and cons of led strip lights?

5. Precautions for led strip lights

Are led strip lights safe?

1. Do LED strip lights overheat?

2. How do you stop LED strips from overheating?

3. Can LED strips catch fire?

4. Is it safe to sleep with LED strip lights on?  

What are the types of led strip lights? Flexible led strip lights VS rigid led strip lights -

1. What are flexible led strip lights?

2. What are rigid led strip lights?

3. What happens if you bend LED strip lights?

4. What is the difference between flexible led strips and rigid led strips?

How to cut led light strips? 

1. Can you cut led light strips? 

2. What happens if you cut an led strip?

3. How to cut led strip lights?

4. How to connect RGB color changing led strip lights with a connector?

5. How to know what your led strip light is?

How to choose the correct SMD led for your strip?

Which is the brightest SMD LED?

What does SMD 5050 mean?

How many lumens is a 5050 SMD LED?

How to know what type of LED strip?

What is the difference between 2835 and 5050 LED?

 

►COB led strip light

What is COB led strip light?

1. What is COB?

2. What is the COB production process? 

3. Different types of COB strip lights

4. What is the difference between COB and SMD led strip lights?

5. What is the difference between COB and LED?

6. Are COB led strips better?

7. How to cut and connect COB led strips?

8. How to install COB led strip lights?

9. Can COB light strips use aluminum channels?

10. Why choose superlightingled?

 

►Led neon lights

What are led neon lights?

1. What is led neon light?

2. What are neon led lights used for?

3. Are led neon lights good?

4. How to choose led neon rope lights?

5. Are led neon ropes use DC or AC?

6. Can you change the light-emitting angle or the luminous way of neon led strip?

7. Silicone Tube VS PVC Tube

How to make led neon lights?

1. How to cut led neon lights

2. Can led neon lights be connected?

3. Easy 7 steps to make led neon lights

4. How to install led neon rope?

 

►Addressable led strip

Ultimate Guide to Choosing the Right Addressable LED Strip

What is an addressable LED strip?

Can you cut addressable LED strips?

How to judge if an LED strip is individually addressable?

How to choose the best DC12V addressable led strips?

How to choose the best DC5V digital led strips?

How to choose the right IC for your project?

Which IC is most commonly used?

How do I know my IC type?

How do I know if my IC is good or bad?

How many types of IC are there?

How to wire addressable led strips?

 

►Color, color temperature, and CRI

The Color Difference Between Warm White 2700K, 3000K, 4000K, 6000K Pure White and 7000K Cool White

1. What is color temperature?

2. What color temperature is right for me?

• 2700K VS 3000K

• How obvious is the difference between 2700K and 3000K?

• Warm White 3000K VS Natural White 4000K VS Daylight White 6000K

• Warm White VS Cool White

3. Enjoy 2700K, 4000K, 6000K

4. Further Reading: How to install Warm White LED light strip?

How to choose the right color for your led strip lights? -

1. How many colors are in LED strip lights? 

2. What do LED light colors mean?

3. Why do white LED light turns to yellow? 

4. Why are your led strip lights not the same color?

5. What is the most relaxing color for LED lights? 

6. What color led lights is best for sleeping?

7. Are led lights bad for your eyes? 

8. Is cool white or warm white better for eyes?

What is color temperature?

1. What is the best color temperature?

2. Does color temperature keep the same as time goes by?

3. What color temperature is best for night?

4. Led strip lights about color temperature,CCT VS RGBW VS RGBCCT;

What is color rendering in​dex?

1. What is CRI in led lights?

2. How to choose the right CRI when buying led strip lights?

3. What is the relationship between CRI and brightness?

4. Is higher CRI better? High CRI VS Low CRI;

5. How to find CRI value? 

 


Led strip light connection

How to connect led strip lights?

1. How to connect led strip lights together?

2. How to connect LED light strips without connectors?

3. How to solder wires to LED strips?

4. How to connect LED strips without soldering?

5. Which one is better between soldering and using a connector?

6. How to connect mutiple led strip lights?

7. How many LED strip lights can you connect?

How to connect led strip to the power supply?

1. Ensuring the working voltage and power first

2. How to hardwire led strip lights?

3. Can I connect multiple LED strips to the same LED power supply?

How to wire led strip lights?

How to wire single color led strip lights?

How to wire tunable white/CCT led strip lights?

How to wire RGB color changing led strip lights?

How to wire RGBW led strips?

How to wire RGBCCT led strip lights?

How to wire addressable led strips?

 


Controller for led strip lights

How to choose led strip light controllers?

1. WIFI controller

2. RF controller

3. IR controller

4. Bluetooth controller

5. Remote control and panel control

6. Single color controller and multi-color controller

7. DMX512 controller

8. SPI controller

9. DALI controller

10. 0/1-10V dimmer

11. Triac series

12. Sonsor series

 


Led power supply

How to calculate power for led strip lights?

4 steps to calculate the power you need

Performance And Reasons Of LED Voltage Drop

How to choose led strip light power supply?

1. Alternating current power supply VS Direct current power supply

2. Constant current power supply VS Constant voltage power supply

3. How to choose the best led power supply for your led strip light?

 


Led strip light installlation

How to install led strip lights? What accessories will be needed?

1. Adhesive installation for IP20 and IP65 led strip lights

2. How to choose the right led tape?

3. Can IP20 and IP65 led strip lights use aluminum profiles?

4. How to use aluminum profiles?

5. Mounted clip installation for IP67 and IP68 light strips

How to install LED sensor stair lights?

Lighting Up Your Stairs With LED Strip Lights Ideas

How to install led strip lights on TV?

How to install led strip lights outdoor?

 


Accessories

How to choose led strip light connectors?

1. Are all LED light strip connectors the same?

2. How do LED strip lights connectors work?

3. What connectors do you need for LED strip lights?

4.  What are the different kinds of LED connectors?

5. How to choose the right connector for your led strip lights?

Ultimate Guide on Aluminum Profile for LED Strip Lighting

1. What are aluminium profiles used for?

2. Why choose aluminum profiles?

3. Different types of LED aluminum profiles

4. LED aluminum profile VS COB LED strips

5. How to install LED aluminum channels?

6. How To Get Ideal Light Diffuser For Your LED Strip?

7. Add Black Aluminum LED Light Diffusers For Your Home Lighting

8. How To Find The Right Aluminum LED Light Strip Diffuser Channel?

 

Customers who bought this product also purchased...

Scroll for more →